Malaysia expects up to 11,000MW in new RE capacity by 2030

ddc7ef237714de3764b61141fdf73d9937930a0d72997400344c0fd3426ab242

KUALA LUMPUR: Malaysia expects an additional 10,000 to 11,000 megawatts (MW) of renewable energy (RE) capacity to come online by 2030, with installed capacity already reaching nearly 32 per cent, or about 14,000MW, as of Sept 1.

Comments

Leave a Reply

Discover more from UM LEGACY PRESS LTD

Subscribe now to keep reading and get access to the full archive.

Continue reading